
ICE Nuremberg-Ingolstadt »WEBAC®1405WEBAC®4525
WEBAC® Protects Ice »WEBAC®4110
Subway Warsaw, PL »WEBAC®151WEBAC®157WEBAC®1403
AquaDom in Berlin »WEBAC®4170
Tunnel Repair With WEBAC®Products »WEBAC®4110WEBAC®1405
Steel Mill Hoogoven in Beverwijk, NL »WEBAC®4170WEBAC®4525
Øresund Tunnel, DK »WEBAC®1405
The Europa Passage »WEBAC®150WEBAC®157
Admiralspalast Berlin »WEBAC®240WEBAC®4110
Hirschhorn Lockage »WEBAC®150WEBAC®1405
Hellberg Tunnel »WEBAC®240WEBAC®150WEBAC®1405
The Katzenberg Tunnel Project »WEBAC®1405WEBAC®4525
Project Reports: Crack Repair
Bridge classified as Historical Monument Saved by Injection with WEBAC®1403
The Netherlanders are really proud of their "Oude Ijsselbrug Katerrreer 1" in Zwolle. Being a historical monument this bridge looks back upon a long historic-cultural tradition. Unfortunately, all these years have left their mark on the structure of the bridge. Fine cracks have formed in the pillars which threatened to endanger the entire structure in the long run. Therefore the 2-component PU Injection Resin WEBAC®1403 was injected in the course of a basic reconstruction scheme. This sealing system is of low viscosity, absolutely solvent-free and suitable for sealing cracks and cavities in dry and wet areas. Thanks to this crack injection the bridge could be re-opened and is now perfectly prepared for any strain caused by traffic and weather.
From: WEBAC Aktuell March 1996







print



