
Clinical Center Hanover »WEBAC®2260
Bergedorf Castle »WEBAC®150WEBAC®1403WEBAC®250
Historic Mill in Potsdam »WEBAC®5611WEBAC®1403
Tradition Preserved by WEBAC® »WEBAC®1404
Bank Building Rzeszow, PL »WEBAC®1403WEBAC®151WEBAC®5611
The Neue Wache in Berlin »WEBAC®250WEBAC®5611
Admiralspalast Berlin »WEBAC®240WEBAC®4110
Hirschhorn Lockage »WEBAC®150WEBAC®1405
Historic Moat in Eutin »WEBAC®1440
The Katzenberg Tunnel Project »WEBAC®1405WEBAC®4525
Villa Buchhof »WEBAC®1403
Products for Special Solutions »
Project Reports: Waterproofing of structures
Heringsdorf Railway Station
Reorganization of the preciousness with proven WEBAC® Products
Located on the island of Usedom in the North East of Germany is the Heringsdorf "Emperor's Spa", literally translated from the German "Kaiserbad". This seaside resort is surrounded by forest, dunes and the Baltic Sea and is very rich in tradition. 100 years ago, the German Emperor Wilhelm II used to come here for vacations enjoying the island's chic and illustrious lifestyle. Of course he was more than welcome on this sunny island. He used to travel by train from Berlin after the railway had been finished in 1894. Today the island's railway lines are being successfully operated by the Usedom Bäderbahn using most modern rail coaches. As the old railway buildings crumble faster than emperors' fame and glory, the Heringsdorf Railway Station was left in desperate need of repair. In fall 1996, the track system of the Usedom's largest railway station was done up but the railway building itself was going to ruins. This is why the layout engineers Raub and WEBAC® were commissioned to elaborate a concept to save the building. According to their specifications, the company SPESA from Prenzlau carried out the necessary post-construction sealing procedures, of course using our proven WEBAC®Products. WEBAC®5611 was used for installing a post-construction exterior sealing; PU Injection Resin WEBAC®1403 was injected into the brickwork as horizontal water stop to counteract the rising dampness. Injection Gel WEBAC®240 was injected into the brickwork of the over-built basement walls, and a WEBAC® Injection Tube Type 1 was installed to seal the joints between the walls and the new concrete floor. Alltogether, it took two years to complete this project. Now the historic railway station is fit and "dry" for the future - and the island visitors won't get wet feet before reaching the spa.
From: WEBAC Aktuell July 2002








print



