+49 40 670 570

Products

Productgroups

Applications

Projects

Downloads

In the land of the Pharaohs

The infrastructure in the country on the Nile and especially in the capital counting 16 million inhabitants has been steadily improved over the last few years.

During the construction and reconstruction of several large-scale projects WEBAC Products were, for example, used for the following projects: Leakage problems in Cairo's new purification plant (daily performance 1.5 million m³) were solved by injecting WEBAC PU Injection Resins.

EP coating resins were used for protecting the steel construction of the "Bridge of the 6th October" in Cairo. Near Alexandria, the Mena Monastery was sealed against penetrating dampness at soil level by means of WEBAC PU Injection Resins.