Tunnel Face Pre-injection
Stabilization of loose rock, rubble or soil in tunnel driving for protecting the team and equipment when driving tunnels or galleries
Stabilization of loose rock, rubble or soil in tunnel driving for protecting the team and equipment when driving tunnels or galleries
Securing of tunnel driving operations against unconsolidated rock and rubble sliding down and when breaking through fault zones
Stabilization of heading faces in tunnel or gallery driving; mostly for preparing further stabilization measures
Installation of tie rods and injection nozzles for securing unconsolidated rock, fault zones and dams
Consolidation of subsoil in dam construction and tunnelling
Filling and stabilization of cavities, washed-out voids and gaps – mostly using expanding reaction resins
Protection from unconsolidated rock or rubble sliding down and of fault zones; in general implemented between interior construction and rock mass
Permanent prevention of water ingress by sealing measures behind the structure
Post-construction damp-proof course (dpc) against capillary rising moisture and construction sealant
Post construction surface sealing for undergrade building components
Filling, solidification and stabilization of structures
Closing, sealing, limited flexibility bridging or bridging where strructural strength is required
Sealing of construction joints and expansion joints in structural and civil engineering
Restoration and conservation of monuments and historic buildings
Sealing water-bearing cracks and joints in foundation pits in sheet pile wall or slot construction
Sealing of joints and cracks in sewers and shafts
Solidification and stabilization of soil
Impregnation, priming and sealing of industrial and useful surface areas
Bituminous external sealing for underground building structures